+86-572 2206669
video

Colorless Asphalt SAL60 ( Synthetic Decolorized Asphalt )

●Chemical Formula: Multimodal C+H+O Copolymer
●Product Form: Colorless Asphalt,Bitumen Substance in Solid.
●Substances Index: Polymer Modified Asphalt PMA, Polymer Modified Bitumen PMB
●CAS No.: 93662-74-3 & 64742-16-1 & 1195978-93-8
●Delivery as FOB, CIF, FCA, DAF, CIP Base TT, L/C, D/P Payment term, Safety Wooden BOX Packaged with Standard Palletized Suited for container loading delivery transport.
●Brief guide: the synthetic decolorized asphalt SAL60 type is suitable for Medium and Light Traffic Lanes coloured road face pavement, and our other professional synthetic decolorized colorless asphalt including typical decolorized asphalt colorless SBL70, SAL60, SAH70 and SAH130 etc, that suitable for Sport Bicycle Lane, Non Motorized Vehicle Lane, Medium and Light Traffic Lanes, Heavy-duty Traffic Lane and minus -40 ℃ in Cold Regions colored asphalt mixture pavement.

Description

Synthetic Decolorized Asphalt, colorless asphalt, or muticolour colored asphalt colorless binder, is a new type of material among many road construction materials. There are currently two widely used types:

1) One method is to add color powder to a decolorized colorless asphalt and then get colored asphalt mixture material. Decolorized colorless asphalt can be obtained through bitumen, asphalt decolorization, or it can also be synthetic prepared from light colored polymers such as petroleum resins.

2) Another is obtained through direct technical modification of the original bitumen, asphalt. This asphalt also said environmentally friendly asphalt, the colorless asphalt has the characteristics of strong aging resistance of asphalt, and it pavement red color is wine red, brownish red in deep shade.

Colored Asphalt Pavement Technology : Cold laid colored pavement and Hot mixed asphalt HMA colored pavement.

The Typical Colored Asphalt Pavement is a colored asphalt mixture composed of decolorized asphalt as the binder, various colour asphalt pigments added, and various levels of stone ( aggregate ) mixed at the asphalt mixing station to form a colored asphalt pavement. After hot paving and hot rolling and then it is formed smoothly.

Coloured Asphalt Materials Productive Process by GREEFIELD

Coloured Asphalt Mixture Productive Process by GREEFIELD ®

Colored Asphalt can be mixed and mixed with various color specifications of stone aggregates, pigments, additives, and other materials at specific temperatures according to different mixture formulation, and can be configured into various colored asphalt mixtures with bright colors, chemical properties, stability, and other characteristics, which can play a role in water drainage, anti slip, anti rutting, and beautification of the city.

Our factory ZHEJIANG GREEFIELD INDUSTRY CO,.LTD produce the EUVAN® series direct feeding environmentally friendly bagged decolorized asphalt in bright colorless products are new type of colored asphalt pavement material, whose unique chemical composition and molecular structure endow it with unique thermoplasticity and super strong adhesion.

This bagged decolorized colorless asphalt has no special requirements for the acidity or alkalinity of the stone material. The produced colored asphalt concrete has good high and low temperature performance, excellent weather resistance to complex environments such as acid, alkali, water, and light, and does not require the application of emulsified asphalt and hot asphalt binder oil. It has a bright and long-lasting color.

Compared to traditional construction techniques, it is simpler and more effective, making it the most excellent colored asphalt pavement construction material on the market today.

 

Decolorized Asphalt Colorless Product's Features:

1). Do NOT need for dedicated bright decolorized colorless asphalt storage tanks, corresponding asphalt dedicated pipelines, and heating and insulation equipment;

2). Do NOT need for specialized de barrel asphalt equipment;

3). Lightweight small packaging facilitates direct feeding into mixing tanks, simplifies production processes, and purifies the production environment;

4). Lightweight 5 kilograms or 10 kilograms per piece of material, easy to feed directly, and easy to operate;

5). Colored asphalt mixture has the characteristics of high modulus, high elasticity, and low temperature resistance, which can meet the relevant technical requirements of asphalt concrete. It can be used for heavy-duty traffic and channelized traffic sections, medium and light traffic sections, non motorized vehicle lanes, and extremely cold road sections of colored asphalt pavement. At the same time, it can also lay permeable OGFC pavement and SMA asphalt pavement with high quality requirements.

*Note : OGPC = Open-grade Friction Courses , SMA = Stone Matrix Asphalt or Stone Mastic Asphalt

6). The relative density of bagged bright decolorized colorless asphalt is 0.95 ~ 1.05 g/cm3 range.

 

EUVAN® series Bagged Synthetic Decolorized Asphalt Production Sheet :

TYPE / MODEL

SBL 70

SAL 60

SAH70

SAH130

Applicable Road Surface Pavement

Sport Bicycle Lane
( Non Motorized Vehicle Lane )

Medium and Light Traffic Lanes

Heavy-duty Traffic Lane

<-40 ℃ in Cold Regions

Viscosity 135℃ ( Pa·s )

1.0~4.0

1.5~3.5

2.0 ~ 5.0

1.0~4.0

Penetration Index ( PI ) ( 25℃,100g, 5s) , (0.1mm)

≥ 60

≥ 50

≥ 40

≥ 80

Extension Degree(cm, 5℃)

≥ 30

≥ 25

≥ 20

≥ 40

Softening Point ( ℃ )

≥ 50

≥ 65

≥ 75

≥ 45

 

Production and Paving Construction Instructions for Colored Asphalt Mixture:

1. Stone & Aggregate Material Requirements

1.1 Coarse aggregate: Conventional stone materials can be used.

1.2 Fine aggregate: Conventional stone materials can be used.

1.3 Depending on the type of mixture, mineral powder may not be added or an appropriate amount of mineral powder may be added.

2. Design of Mix Proportion Formulation for Colored Asphalt Mixtures

2.1) OGFC graded ( Open-grade Friction Courses ) permeable colored pavement base on open-graded bituminous paving mixtures ( open graded asphalt mixtures )

Grading: Refer to the grading standards and corresponding mix design methods in JTG F40-2004 "Technical Specification for Construction of Highway Asphalt Pavements" for mixture formulation design.

*Note: The JTG F40-2004 standard was approved for issuance by the Ministry of Transport of the People's Republic of China.

The dosage of bagged synthetic decolorized colorless asphalt : The optimal dosage is determined using the mixture design method proposed by OGFC in JTG F40-2004 "Technical Specification for Asphalt Pavement Construction", or the recommended dosage can be simply adopted. The dosage of bagged colorless asphalt is 4.5% -5.5% of the mineral aggregate dosage. The porosity range should be between 18% and 25% range.

2.2) Semi-open graded AM colored pavement base on half(semi)-open-graded bituminous paving mixtures ( half(semi)-open-graded asphalt mixtures )

Grading: Refer to the grading standards and corresponding mix design methods in JTG F40-2004 "Technical Specification for Construction of Highway Asphalt Pavements" for mixture formulation design.

The dosage of bagged synthetic decolorized colorless asphalt: The optimal dosage is determined using the mixture design method proposed in JTG F40-2004 "Technical Specification for Construction of Highway Asphalt Pavements", or the recommended dosage can be simply adopted. The dosage of bagged colorless asphalt is 4.5% ~ 5.5% range of the mineral aggregate dosage.

2.3) Classified AC colored asphalt pavement base on dense-graded bituminous mixtures ( dense-graded asphalt mixtures )

Grading: Refer to the grading standards and corresponding mix design methods in JTG F40-2004 "Technical Specification for Construction of Highway Asphalt Pavements" for mixture formulation design.

The dosage of bagged synthetic decolorized colorless asphalt : The optimal dosage is determined using the mixture mixture formulation design method proposed in JTG F40-2004 "Technical Specification for Construction of Highway Asphalt Pavements", or the recommended dosage can be simply adopted. The dosage of bagged colored asphalt is 4.5% ~ 5.5% range of the mineral aggregate dosage.

2.4) SMA colored asphalt pavement ( SMA = Stone Matrix Asphalt or Stone Mastic Asphalt )

Grading : Refer to the grading standards and corresponding mix design methods in JTG F40-2004 "Technical Specification for Asphalt Pavement Construction" for mixture formulation design.

The dosage of bagged synthetic decolorized colorless asphalt : The optimal dosage is determined using the mixture design method proposed in JTG F40-2004 "Technical Specification for Construction of Highway Asphalt Pavements", with a mineral powder dosage of less than 10%. It is also possible to simply adopt the recommended dosage, with a bagged asphalt dosage of 4.5% ~ 6.5% range of the mineral aggregate dosage, a mineral powder dosage of 7% rate, and no fiber or 0.1% rate bagged wood fiber.

Red and Yellow Coloured Asphalt Mixture Povement-GreefieldR

Red and Yellow Coloured Asphalt Mixture Povement - Greefield ®

3. Mixing and Construction process of asphalt mixture:

The construction process of bagged bright synthetic decolorized colorless asphalt and modified asphalt mixture is similar, but the following points should be emphasized :

3.1 Mixing and Transportation of Colored Asphalt Mixture

1).Before mixing, the mixing tank of the mixing plant should be dry mixed with hot aggregate several times to clean it thoroughly.

2).The performance of raw materials should be stable, so that the production mix ratio can be as close to the design mix ratio as possible;

3).The temperature of the aggregate should be controlled between 170 ℃ and 190 ℃ range.

4).The bagged bright synthetic decolorized colorless asphalt is packaged in EVA bags, with a standard bag size of 5KG (or 10KG per standard bag according to customer customization). Before use, calculate the amount of bagged colorless asphalt that needs to be added to each mixing tank based on the specific situation of the mixing station. When the aggregate enters the mixing tank, the bagged colorless asphalt will be manually added directly to the mixing tank; During mass production, bagged colored asphalt can also be unpacked and added to tanks for direct weighing and transportation; Alternatively, a belt conveyor can be used for feeding. It is particularly important to mix the last batch of materials in the mixing tank for no less than 60 seconds. The specific mixing time is based on the absence of white material in the mixture, which can be determined through the first pot mixing test during actual production, but it must not be less than 60 seconds.

5). Vehicles and coverings used for transporting mixtures should also be cleaned in advance.

 

Summary of Mixing and Construction Requirements for Colored Asphalt Mixture:

Mixing of Asphalt Mixture

Aggregate Heating Temperature

170 ℃ ~ 190 ℃ range

Bagged Decolorized Asphalt Heating Temperature

165℃ ~ 170 ℃ range

Discharge Temperature of the Mixture

150℃ ~ 175 ℃ range

Construction of Asphalt Mixture

Preliminary Road Compaction

above 140 ℃ (other) / above 160 ℃ (SMA)

Final Road Compaction

above 90 ℃

Open Traffic Service

Surface Temperature Less Than 40 ℃

3.2 Colored Asphalt Mixture paving.

1). The paving process of bagged bright decolorized colorless asphalt mixture and modified asphalt mixture is basically the same;

2). The paver machine should be cleaned thoroughly, especially the ironing board should be cleaned with solvent or the colored mixture should be spread on the lower layer of the road surface until there are no stripes on the surface;

3). Before paving construction, comprehensive consideration should be given to the production, transportation, paving, and rolling capacity of the mixture to ensure continuous paving and achieve uninterrupted full width paving in one go, in order to maintain consistent color, uniform and beautiful granules.

4). It is strictly prohibited to sprinkle emulsified asphalt as a bonding layer before paving construction, in order to avoid paving pollution and affect paving effect, and to save paving costs and shorten paving period.

Blue and Green Coloured Asphalt Mixture Povement-GreefieldR

Blue and Green Colored Asphalt Mixture Povement - Greefield ®

3.3 Compaction and shaping of colored asphalt mixture

1). The water in the water tank of the roller should be replaced in advance, and any rust marks should be washed clean. The roller should stop on the wooden pad so that it does not come into contact with the lower layer of black asphalt. When rolling, it should be driven directly from the wooden pad to the colored mixture. Rolling can be carried out immediately after paving. Any equipment used during this process that comes into contact with the colored asphalt mixture, including manual shovels, should be cleaned thoroughly.

2). The rolling combination method of colored asphalt mixture is the same as that of modified asphalt mixture.

3). The compaction strength should be ensured as much as possible without embossing the stone material, but overpressure is strictly prohibited. If the stone material is crushed, it will seriously affect the color effect.

4). Mechanical paving must stop manual work or manual paving and material replenishment after rolling begins. Otherwise, due to surface water, manual paving and material replenishment will be difficult to bond with the material below. This point needs to be emphasized through repeated training for construction personnel in advance. Manual paving should be leveled and rolled as soon as possible to ensure construction temperature.

5).To prevent contamination of the colored surface layer, any debris and sand adhering to the steel wheels of the roller must be washed away with water before rolling. Rolling can only be carried out after ensuring that the rolling equipment is clean. Construction personnel must clean their shoe soles before construction, wear shoe covers when leaving the paving area, and remove shoe covers when entering the paving area again to ensure that the shoe soles are clean and free of pollution. Traffic can only be opened after the compaction is completed and the temperature has cooled down to room temperature. Try to avoid road pollution caused by personnel trampling and non construction machinery on the road during the construction process and before opening up traffic.

As long as you strictly follow the above instructions for production and construction, your colored asphalt pavement project can achieve uniform, bright, and long-lasting appearance quality and ideal road performance. Wishing you more prosperous business and more successful projects!

 

Classic Colour Asphalt Pavement Hot Mixed Material Formulation Sheet :

EUVAN® Colorless Asphalt Type

Synthetic Decolorized Asphalt SBL70

Synthetic Decolorized Asphalt SAL60

Synthetic Decolorized Asphalt SAH70

Synthetic Decolorized Asphalt SAH130

Applicable Road Surface Pavement

Sport Bicycle Lane, Non Motor Vehicle Lane

Medium and Light Traffic Lanes

Heavy-duty Traffic Lane

<-40 ℃ in Cold Regions

Asphalt Pigment Type

Base on 1000Kgs Aggregate Stone Materials for Hot Mixed Prepared

GREEFIELD®

Asphalt Pigment Red. Type: 4110, 5120, S130, 5130, 6130

+ 50kgs ~52kgs Colorless Asphalt SBL70;

+ 25Kgs ~30Kgs Pigment Red 4110, 5120

+ 50kgs ~52kgs Colorless Asphalt SAL60;

+ 25Kgs ~30Kgs Pigment Red 5120, S130

+ 50kgs ~55kgs Colorless Asphalt SAH70;

+ 25Kgs ~30Kgs Pigment Red 5130, 6130

+ 50kgs ~55kgs Colorless Asphalt SAH130;

+ 25Kgs ~30Kgs Pigment Red 5130, 6130

GREEFIELD®
Asphalt Pigment Red. Type: 4110, 5120, S130, 5130, 6130

-------

+ 50kgs ~52kgs Decarbonized Black Asphalt ;

+ 50Kgs ~ 55Kgs Pigment Red 5120, S130

+ 50kgs ~55kgs Decarbonized Black Asphalt ;

+ 50Kgs ~ 55Kgs Pigment Red 5130, 6130

+ 50kgs ~55kgs Decarbonized Black Asphalt ;

+ 50Kgs ~ 55Kgs Pigment Red 5130, 6130

GREEFIELD®
Asphalt Pigment Blue. Type: 8103, 8107, 8160, 8260

+ 50kgs ~52kgs Colorless Asphalt SBL70;

+ 30Kgs ~ 35Kgs Pigment Blue 8103, 8107

+ 50kgs ~52kgs Colorless Asphalt SAL60;

+ 30Kgs ~ 35Kgs Pigment Blue 8107, 8160

+ 50kgs ~55kgs Colorless Asphalt SAH70;

+ 30Kgs ~ 35Kgs Pigment Blue 8160, 8260

+ 50kgs ~55kgs Colorless Asphalt SAH130;

+ 30Kgs ~ 35Kgs Pigment Blue 8160, 8260

GREEFIELD®

Asphalt Pigment Green. Type: 560, GX56, GX66

+ 50kgs ~ 52kgs Colorless Asphalt SBL70;

+ 25Kgs ~ 30Kgs Pigment Green 560, GX56

+ 50kgs ~52kgs Colorless Asphalt SAL60;

+ 25Kgs ~ 30Kgs Pigment Green 560, GX56

+ 50kgs ~55kgs Colorless Asphalt SAH70;

+ 25Kgs ~ 30Kgs Pigment Green GX56, GX66

+ 50kgs ~55kgs Colorless Asphalt SAH130;

+ 25Kgs ~ 30Kgs Pigment Green GX56, GX66

GREEFIELD®

Asphalt Pigment Gray. Type: 9360, 9370

+ 50kgs ~ 52kgs Colorless Asphalt SBL70;

+ 25Kgs ~ 30Kgs Pigment Gray 9360, 9370

+ 50kgs ~ 52kgs Colorless Asphalt SAL60;

+ 25Kgs ~ 30Kgs Pigment Gray 9360, 9370

-------

-------

Standard Package for Asphalt Pigments

Net 25kg/bag in EVA & PE Hot melt bag, Re-package 40bags/1000kgs or 44bags/1100kgs into container-bag base on standard fine palletized safety for FCL container transport.

Transportation & Storage for Asphalt Pigments

Protect against weathering. Store in a dry place and avoid extreme fluctuations in temperature.

Special conditions for opened packaging: Close bags after use to prevent the absorption of moisture and contamination.

Aggregate Stone Materials Ratio for AC Class Hot MIX Asphalt HMA

Mesh 0-3mm @ 28% plus 3-5mm @ 40% plus 5-10mm @ 32%

Aggregate Stone Materials Ratio for SMA Class Hot MIX Asphalt HMA

Mesh 0~5mm @ 40% part PLUS 5-10mm @ 60% part

ChromeGreenColourAsphaltPavementBaseLayering-Greefield
Chrome Green Colour Asphalt Pavement Layering Base by Greefield®

About the more details on colored asphalt paving technology, also kindly please visit our share page at Colored Asphalt Materials, Research, Technology and Project Pave Construction smoothly and please carefully reading it if possible.

About the more details on colored asphalt pigment, mixtures pavement technology, also kindly please visit our share page at : Colored Asphalt pigments, Colored asphalt mixtures and colored asphalt pavement cases smoothly and please carefully reading it if possible.

Welcome to consult, exchange, and technical discussions on colored asphalt pigment materials, synthetic decolorized asphalt, design, construction, paving, and project maintenance of colored asphalt engineering.

Welcome to inquiry our more types Synthetic Decolorized Asphalt products by email: Vip@Greefield.com or by WhatsAPP: +86139 5726 4669 smoothly , the TDS request through WhatsAPP smoothly.

 

Hot Tags: colorlees asphalt sal60 ( synthetic decolorized asphalt ),asphalt pigment, China colorlees asphalt sal60 ( synthetic decolorized asphalt ),asphalt pigment, manufacturer, supplier, factory

Contact Supplier